Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9527243

- Product Categories
- Friendly Links
- home > Supply > Supply Guangzhou QC080000, Foshan QC080000 consulting, implementation of lessons learned
Information Name: | Supply Guangzhou QC080000, Foshan QC080000 consulting, implementation of lessons learned |
Published: | 2013-07-12 |
Validity: | 90 |
Specifications: | Guangzhou QC080000, Foshan QC080000 consulting, implementation of lessons learned |
Quantity: | 30.00 |
Price Description: | |
Detailed Product Description: | Dongguan EU enterprise management consulting firm consulting business scope ISO9000 quality certification ISO14000 environmental OHS18000 security QC080000 Hazardous Substance TS16949 automotive AS9000 aeronautical communications ISO13485 medical device TL9000 ISO22000 food organic foods Good Manufacturing Practice 高标准 SA8000 Social Responsibility Social Responsibility IRIS Railway WRAP clothing ETI British Ethical Trade AVE German social responsibility of business ethical trade BSCI ICTI Toys C-TPAT terror CCC mandatory EICC building electronic information GB50430 ISO14064 ISO27000 Information Security FSC forest carbon emissions social responsibility audits terrorism audits Internal Auditor Training Mill effectiveness of various management training day management of change, Guangzhou QC080000, Foshan QC080000 consulting, implementing lessons learned Dongguan Central Enterprise Management Consulting Firm. QC080000 implement lessons learned - written on QC080000HSPM to 2008/6/20 our company after the implementation of the implementation of the authentication phase QC080000 system basically come to an end , and passed BV, interlocutory. From this period the implementation of external audit experience to complete the process of review through the process I put myself in the implementation of this system on the lessons learned in the future to facilitate the implementation of the work we have some reference value. A cognitive QC080000 (Guangzhou training) in the end what is 080000? The answer on the Internet already have a good explanation, we can find some relevant data to look at, in WWW.6SQ.NET reference. Advance the implementation of the training system is an unwritten principle here, including full training, high-level training, the implementation of this system to figure out where the meaning. Do not engage in formalism, because not necessary. Implementation of personnel must be clear concepts related to this system, do not stay on the surface, not the whole bunch of data in there, waste of resources. Clarify HSF HS RS and other related concepts for the future implementation of the commencement of the work is very necessary. Many ways, specialized companies can consult. Within the organization posted a variety of posters are feasible. Important is the awareness and advance the concept of culture. II. Implementation Plan Implementation Plan is developing system implementation very important aspect of the work. Basically revolves around the commencement of the progress of work to expand the program. Styles can be used Gantt chart. Simply lists several projects: an import plan (the existing system diagnosis was established HSPM Implementation Team, RoHS/WEEE/080000 system of import-related training, 080000 internal auditor training and qualification, formulate policies HSF / management representative appointed) two implementation plan (statutory and regulatory requirements / Customer HSF requires an assessment to establish HS list, QA Training (product risk identification, product testing), PR training (qualified suppliers to establish eligibility, evaluation and re-evaluation), PE Training (New Product Planning , material coding, recognition, engineering change), HSPM second document discusses / revisions / distribution, HSPM third-order document revisions / distribution, material / process / governance tools HSF assess and control the implementation of the implementation plan set three (HSPM system File advocacy, policies full advocacy, system operation, and improvement of internal audit, management review and improvement) four authentication phase (certification application to obtain a certificate). above plan is only a reference, also according to the size of organization and production patterns themselves adjustment in the actual work carried out at that stage in a timely and plan comparison report to your top leadership know is the nature of things belonging to a skill, personal to grasp III. supply-side management is the organization and implementation of supply-side production of raw materials source of supply-side management is a very important part. QC080000 system requirements embodied in clause 7.4, the need to establish operating procedures for the procurement side management programs and other related files. management include: supplier selection standards; for party audits (those that require on-site audit, those who need a written assessment, organizations can own a classification result for the Russian side to define); and supplier signed a "green statement" and other similar agreements to ensure that organizations reduce the cost risk (of course Many suppliers do not want to enter into this agreement, organize themselves to communicate); accordance with the importance of the material to be classified on the supply side (such as important material, with the material, the general materials, etc.); establish qualified supplier directory (also called green supplier directory: Green Supplier Directory Personal understood to be passed through tissue content of harmful substances in the assessment, and did not occur during the delivery of harmful substances exceeding the manufacturer before they can qualify). supplier's risk level assessment is a very special work. enterprises according to material risk (the risk that may contain hazardous substances) A, the supplier's own risk B (such as a supply-side, there have been cases of excessive harmful substances can be defined as high risk for side ) to comprehensive assessment of a supply-side end is high or low or normal risk (A * B is the final value of the supply-side risk score), such as plastic materials may be added halogenated flame retardants, the plastic material on can be defined as high-risk material; Again stainless steel materials containing heavy metals is unlikely to be recognized as a low-risk materials. IV., and supply-side environmental agreement signed environmental agreements that have been mentioned in the front, but also deliberately caught out instructions Click This agreement will take effect only occurs lawsuit he lowered the cost of the organization of the risk does not necessarily guarantee no harmful substances exceeding supply-side events. companies rush to engage these are also forms a natural law provides several specific how to operate You can define your suggested a classification of two supply-side comparison of NB Some suppliers do not want to sign in to your supply-side management-related measures defined in the program to solve three progressively updating laws and regulations or the requirements for timely delivery to the party information sharing 4 This agreement not to list any specific HS substances generally more trouble signing one-year period can be renewed for five companies control their inventory HS should promptly delivered to the supply-side 6 note submitted by the parties for similar SGS CTI test report basic RoHS test items are on the customer's specific requirements (halogen PFOS, etc.) must be communicated to the supplier if there is a need, please supply side songce 7 attention to the supply side in accordance with the material nature of the risk rating of the assessment methodology to define the organization itself (such as the number of cases of harmful substances exceeding the risk of material, etc., to comprehensive consideration) five. IQC's role in the implementation of procurement 080000 product will go back IQC, IQC in addition to test performance dimensions and other related projects, but also for content of harmful substances do inspections, of course, frequency and sampling program can follow the material and the supplier's risk level assessment to define themselves. IQC personnel must have identification provided by the supplier or the authenticity of the report sent to test their ability to require this capability definitions related to your file. six. material and auxiliary material here covers the main management materials, subsidiary materials, packaging materials, (there may be chemicals) and so on. Materials Management: Feed materials management, process materials management, management of semi-finished products, finished goods management, etc. in accordance with the process of the division process; subsidiary materials are also called consumables management, chemicals management can establish a "Materials Management Operating Procedures", "feed Inspection Procedure", "product protection operational procedures." and other related files. managed content: Feed HSF test, HSF and HS division of the region (covering the defective area) many companies have set up their own BOM, then not included in the BOM of the material and products may be in contact the generation of hazardous substances and residues, is a big risk, so is the need to control. IQC IQC, PQC confirmation process in the application of supplies, and make inspection records. supplies out a control list, including models, agents, hazardous substances test report cases etc. The main material can try coding with coding to define HSF materials. Guangzhou QC080000, Foshan QC080000 certification management consulting, implementation of lessons learned |
Admin>>>
You are the 34354 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan, Guangdong, China-EU Enterprise Institute All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 34354 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan, Guangdong, China-EU Enterprise Institute All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility